Page 1 of 1

Little Beam Job

Posted: Thu May 05, 2016 9:50 am
by DLewis0289
Just a little 342 pounds per foot beam job in the shop. 7/64" Dual Shield FCAW (100% UT inspections) plus 1434 holes to drill.
beam.jpg
beam.jpg (43.38 KiB) Viewed 1361 times
beam1.jpg
beam1.jpg (34.23 KiB) Viewed 1361 times
Dry Fit.jpg
Dry Fit.jpg (145.35 KiB) Viewed 1351 times

Re: Little Beam Job

Posted: Thu May 05, 2016 11:34 am
by Artie F. Emm
Dang. Some pretty hefty material, that's for sure. Who gets to drill all those holes, and how do they drill them?

Re: Little Beam Job

Posted: Thu May 05, 2016 12:03 pm
by DLewis0289
My Italian guy....."FICEP CNC beam line lol"

Re: Little Beam Job

Posted: Thu May 05, 2016 12:22 pm
by Artie F. Emm
OK, so not some guy with a mag drill and some cutting oil, good to hear!

Re: Little Beam Job

Posted: Thu May 05, 2016 1:24 pm
by DLewis0289
Funny you should say that...there are 4- 50 footers that are to heavy for the beam line to handle, the guys name is Luis on the back to back mag drills :lol:

Re: Little Beam Job

Posted: Fri May 06, 2016 6:25 pm
by thatoneguy
Dang... That's some heavy stuff lol. What is the job for? Would love to see more pics!

Re: Little Beam Job

Posted: Fri May 06, 2016 8:31 pm
by DLewis0289
Unfortunately nothing classy, they are basically a truss system that will hold up 21 stories of a High Rise Condo over in Miami.